Riding an e-bike
North America & Europe · OEM / ODM

Launch commuter, cargo & adventure e-bikes
from 50 units.

For North American and European brands, dealers and fleet operators who need a controllable configuration, a market-specific compliance path and an after-sales plan — not just a factory quote.

From 50 units

Private label on a proven platform

Sample in 7–25 days

Built to your configuration

Locked BOM

Every change needs your approval

Market-specific compliance path

Assessed per destination, model by model

Three Ways to Start

Tell Us What You Want to Sell — We Build It

Whether you need a fast private-label launch or a differentiated product from scratch, there is an entry point that matches your budget and timeline.

Start with a Platform

Brands and dealers who want to move fast

Pick one of our three platforms, choose a configuration tier, and apply your brand. Fastest route from idea to first shipment.

MOQ
50 units (mixed tiers within one platform)
Lead time
Sample 7–15 days · Production 35–45 days
Fees
No development fee for platform configurations

Customize a Model

Customers with a clear product in mind

Change frame colour, decals, logo, battery capacity, motor, display, saddle and packaging. Every proposed change is assessed against the reference architecture before quotation.

MOQ
50 units (colour / logo) · 100 units (component changes)
Lead time
Sample 15–25 days · Production 35–50 days
Fees
One-off plate charge for logo and packaging — quoted with your configuration

Develop from Scratch

Brands building a differentiated product

Full ODM: market positioning, configuration, cost target, prototype, testing, certification and production.

MOQ
100–200 units for first production run
Lead time
Prototype 30–60 days · Production 45–60 days
Fees
Development (NRE) quoted per scope and itemised before you commit

Product Platforms

Three Platforms, Nine Configurations, One Shared Architecture

Platforms share the same battery architecture, display protocol, wiring harness and BMS — fewer spare parts for you, and a reference architecture that every proposed variation is assessed against before quotation.

P1 Urban Platform platform
P1
North AmericaEurope

Urban Platform

Everyday commuting and city mobility — the volume foundation of any e-bike line.

Not the right fit for: Riders looking for off-road capability, or markets where a throttle is mandatory in the EU.

  • Basic: 500W rear hub (US) / 250W (EU) · 48V 15Ah
  • Performance: 500W high-torque hub (US) / 250W 50Nm (EU) · 48V 20Ah
  • Premium: 750W (US Class 2/3) / 250W mid-drive (EU) · 48V 20Ah premium cells
P2 Cargo & Utility Platform platform
P2
North AmericaEurope

Cargo & Utility Platform

Family transport, small-business delivery and heavy-duty utility work — the fastest-growing e-bike segment in both the US and the EU.

Not the right fit for: Buyers who only need a single low-cost unit, or programmes without a local service setup.

  • Basic: 750W hub (US) / 250W (EU) · 48V 20Ah
  • Performance: 750W high-torque (US) / 250W 80Nm mid-drive (EU) · 48V 20Ah premium cells
  • Premium: 1000W (US, off-road/class-dependent) / 250W mid-drive (EU) · Dual 48V battery, 40Ah total
P3 Adventure / Fat Tire Platform platform
P3
North AmericaRestricted in EU

Adventure / Fat Tire Platform

Beach, trail, RV and outdoor lifestyle — high visual impact and strong social content potential.

Not the right fit for: EU programmes that must stay inside standard 250 W / 25 km/h EPAC rules.

  • Basic: 750W · 48V 20Ah
  • Performance: 1000W · 52V 20Ah
  • Premium: Dual motor 1000W × 2 · Dual battery 48V 40Ah+

Cargo · First Priority

Cargo is not one bike — it is three different businesses

Family transport, last-mile delivery and rental fleets need completely different payload, range and service designs. Choose the route and we configure to it.

Family & passenger

Brands and dealers

  • Rated payload and brake performance with passengers
  • Child-seat and passenger interfaces
  • Stable kickstand, step-through frame, full lighting set
  • First-order spare-parts pack included
Get a family-cargo launch plan

Light commercial delivery

Regional delivery and retail operators

  • Real-world range under load
  • Cargo-box and rack interface options
  • Component protection and fast roadside servicing
  • Dual-battery ready for multi-shift duty
Get a delivery-fleet launch plan

Rental & fleet

City operators and rental companies

  • Durability specification for high utilisation
  • Fleet telemetry and GPS readiness
  • Locked BOM so every batch is identical
  • Serviceable loom and spare-part SLA
Get a rental-fleet launch plan

Why Brands Work With Us

The Difference Is Not the Bike — It Is Who Controls It

Most suppliers quote you a model and stop at FOB. We manage the BOM, the engineering changes, the certification path and your landed cost.

Engineering, Not Just Sourcing

We own the BOM. Cells, BMS, controller and charger brands are specified and locked — any change requires a written engineering change notice approved by you.

Low MOQ, Real Numbers

50 units for private label on an existing platform. You validate the market before committing to a container.

Landed Cost Transparency

We quote FOB and also model your duty, freight and fees so you know the real cost before you commit. Most suppliers stop at FOB.

Evidence Status, Model by Model

We tell you exactly which model holds which record, and whether it is a test report or a listed certification. Eligible variations are assessed against the reference architecture before quotation — never assumed.

Own Factory, Own BOM

We are an integrated manufacturer and exporter. Assembly, testing and packing run on our own line in Huizhou, and the BOM is ours to control — not bought in from whoever is cheapest that month.

After-Sales That Scales

Spare-parts package shipped with the first order, plus a parts matrix, service manuals and video diagnostics for your workshop.

From Brief to Shipment

A Process You Can Plan Around

1
1–3 days

Brief & Market Fit

You tell us the target market, use case, price band and volume. We confirm which platform fits and flag any regulatory constraints.

2
3–7 days

Configuration & Cost Target

We propose 2–3 configurations with BOM-level cost, landed-cost estimate including duties, and a recommended MSRP band.

3
7–25 days

Sample Build

One or two samples built to the agreed configuration with your branding applied. Shipped for your evaluation.

4
Parallel with sampling

Testing & Certification

We run or extend the required testing (UL 2849, EN 15194, battery transport) and hand over the documentation set.

5
35–50 days

First Production Run

Production under a locked BOM and engineering change control, with in-process QC and a golden sample retained for both sides.

6
Ongoing

Delivery & After-Sales

Shipment, spare-parts package, service documentation and a parts matrix so your workshop can support the product locally.

Inside the Programme

A Factory You Can Actually Audit

Our own facility in Huizhou, photographed September 2026 — build floor, packing bays and sample showroom. No stock photography and no renders: a buyer who has audited a Chinese factory can spot borrowed imagery immediately, so we don't use any.

The walkthrough below is the facility's own footage of the same floor. Silent — put it on and judge the floor for yourself.

Export packing bay — JRX facility, Huizhou

Export packing bay

Cartons staged under a DO NOT LAY FLAT instruction before container loading.

Carton specification — JRX facility, Huizhou

Carton specification

Export cartons are print-specified in English with fragile and orientation marks.

Wheel and hub stock — JRX facility, Huizhou

Wheel and hub stock

Assembled wheel sets held pre-build so motor and rim batches stay matched.

Packing station — JRX facility, Huizhou

Packing station

Finished units wrapped, cushioned and palletised by the shipping crew.

Assembly and test floor — JRX facility, Huizhou

Assembly and test floor

Work benches, parts racks and test area on the build floor in Huizhou.

Showroom — JRX facility, Huizhou

Showroom

Sample line kept on site for buyer visits and video audits.

Facility walkthrough

Build floor to showroom · 2 minutes 10 seconds · silent, no voice-over

Full-resolution originals and a live video call available on request

Factory audits — in person or by live video — are welcome before you commit to a production order. Site visit arrangements and NDA handling are part of the planning call, not an afterthought.

What You Get Back

Get a 48-hour launch plan

Tell us your market, use case and volume. Within two working days you receive a one-page feasibility plan from our sales and engineering team — not an acknowledgement email.

  • Recommended platform and configuration tier
  • Destination compliance boundary — what is confirmed, what is still open
  • Sample and first-production timeline
  • Key assumptions behind your landed-cost model
  • Indicative MSRP range for your channel
  • Open risks and a proposed next-call agenda

No charge, no obligation. We would rather qualify a project properly than quote a number we cannot hold.

Project Assurance

Market access is a planning step, not a slogan. We run a market-specific configuration review before quotation, lock the BOM, and prepare the documentation set with you — evidence status is stated model by model, never as a blanket claim.

See how we prepare your market access file

Request your launch plan

Answered by sales and engineering within 2 working days.

1 · Your project
2 · How we reach you
3 · Volume & requirements
4 · Anything else

By submitting this form, you agree to be contacted by our sales team. We respect your privacy — see our privacy policy.

We use cookies to measure site traffic. Analytics are only loaded if you accept. Privacy & Cookies